The picture above you can see the front panel and rail have been french polished, the Hessian has been installed and the springs sown in position and a rolled edge has been installed around the edge, the original packing will be reinstalled and new layers of wadding is added to the top
the new fabric has been applied to the chaise lounge and you can see the completed job